This is a map of a possible high-speed rail network for Southern Ontario. See how the region connects, how travel times change, and what a network like this could mean for how Ontario works.
Take this as a starting point for a conversation about what Ontario should build.
Example travel times under the proposed network. Average speeds reflect real operating conditions — not peak — and account for acceleration, deceleration, and dwell time at intermediate stops.
| Route | Service | HSR Time | By Car (Typical) |
|---|---|---|---|
| Toronto → Niagara Falls | Standard | ~48 min | 90–120 min |
| Toronto → Kitchener | Standard | ~38 min | 90–120 min |
| Toronto → Kitchener | Express i | ~26 min | 90–120 min |
| Toronto → Windsor | Standard | ~2h 00m | ~4h |
| Toronto → Windsor | Express i | ~1h 40m | ~4h |
| Barrie → Hamilton | Standard | ~50 min | ~95–110 min |
| London → Pearson | Standard | ~55 min | ~2h |
| Kitchener → Hamilton | Standard | ~18 min | ~60–90 min |
| Oshawa → Hamilton | Standard | ~44 min | ~90–120 min |
| Oshawa → Kitchener | Standard | ~65 min | ~110–140 min |
Total estimated capital cost: ~$97 billion — comparable to the 401 tunnel, with a fundamentally different outcome.
| Component | Cost |
|---|---|
| Track & Infrastructure | ~$91B |
| Stations | ~$6B |
| Total | ~$97B |
| Segment | Length | Avg Speed | Cost/km | Total |
|---|---|---|---|---|
| Windsor → Chatham | 80 km | 235 km/h | $70M | $5.6B |
| Chatham → London | 100 km | 240 km/h | $75M | $7.5B |
| London → Kitchener | 110 km | 245 km/h | $85M | $9.4B |
| Kitchener → Pearson | 85 km | 200 km/h | $105M | $8.9B |
| Pearson → Toronto | 30 km | 150 km/h | $170M | $5.1B |
| Toronto → Oshawa | 65 km | 160 km/h | $155M | $10.1B |
| Toronto → Hamilton | 70 km | 210 km/h | $135M | $9.5B |
| Hamilton → Niagara Falls | 85 km | 180 km/h | $115M | $9.8B |
| Kitchener → Hamilton | 60 km | 205 km/h | $100M | $6.0B |
| Pearson → Barrie | 115 km | 220 km/h | $95M | $10.9B |
| Pearson → Hamilton | 65 km | 190 km/h | $130M | $8.5B |
| Station | Tier | Connections | Cost |
|---|---|---|---|
| Pearson | Core Hub | 4 | $1.5B |
| Hamilton | Core Hub | 4 | $1.0B |
| Toronto (Union / East Harbour) | Major Hub | 3 | $1.2B |
| Kitchener–Waterloo | Major Hub | 3 | $0.6B |
| Oshawa | Regional | 2 | $0.5B |
| London | Regional | 2 | $0.3B |
| Chatham | Regional | 2 | $0.2B |
| Windsor | Regional | 1 | $0.25B |
| Niagara Falls | Regional | 1 | $0.25B |
| Barrie | Regional | 1 | $0.25B |
| Total | ~$6.1B |